Shift-Handover Quality Reporting Package
Structured defect summaries, line stoppage logs, and first-pass yield charts prepared for each shift change at your plant.
From ₩4,800,000 setup; monthly retainer quoted by line count
EST. 2016 · SEOUL · MANUFACTURING QUALITY
Aldercore Analytics builds operational reporting packages for discrete manufacturing quality teams — defect summaries, stoppage logs, and executive briefings drawn from the data you already collect on the floor.
Reporting Packages
Structured defect summaries, line stoppage logs, and first-pass yield charts prepared for each shift change at your plant.
From ₩4,800,000 setup; monthly retainer quoted by line count
Control chart setup for critical dimensions and torque values, with annotation rules your operators can follow without statistical training.
₩2,200,000 per measurement characteristic (minimum two characteristics)
Monthly facilitated review of defect categories with ranked Pareto charts tied to your corrective action log.
₩850,000 per session
How we work
Client evidence
Our morning meeting used to reopen the same solder defect debate because nobody trusted the previous shift's spreadsheet version. Aldercore's numbered handover IDs fixed that within two weeks — though I wish they'd flagged our duplicate defect codes earlier during setup.
The executive briefing fits on one page my director reads on the plant floor. Scrap cost trend is visible without opening three different MES exports. Setup took longer than quoted because our data exports were messier than we admitted.
Field Notes
A practical note on recalculating SPC limits after fixture swaps, operator rotation, or supplier material batches — without discarding useful historical context.
Most shift handover documents fail because they report everything and highlight nothing. Here is how three Gangnam-area plants restructured theirs.
Teams often default to Pareto charts because they look decisive. Run charts answer a different question — and mixing them up wastes meeting time.
Send a brief describing your lines, shift schedule, and what your team currently produces at handover. We reply with scope options and a site visit date.
Request a brief