EST. 2016 · SEOUL · MANUFACTURING QUALITY

Shift-handover reports your plant managers open before the line restarts

Aldercore Analytics builds operational reporting packages for discrete manufacturing quality teams — defect summaries, stoppage logs, and executive briefings drawn from the data you already collect on the floor.

38
Plants served since 2016
4 hr
Avg. handover prep time saved per shift
Quality engineer reviewing production line documentation at a manufacturing facility

What we prepare for your quality team

Shift-Handover Quality Reporting Package

On-site setup plus recurring report delivery

Shift-Handover Quality Reporting Package

Structured defect summaries, line stoppage logs, and first-pass yield charts prepared for each shift change at your plant.

From ₩4,800,000 setup; monthly retainer quoted by line count

SPC Chart Configuration for Assembly Lines

Project-based configuration

SPC Chart Configuration for Assembly Lines

Control chart setup for critical dimensions and torque values, with annotation rules your operators can follow without statistical training.

₩2,200,000 per measurement characteristic (minimum two characteristics)

Defect Pareto Analysis Sessions

Half-day on-site or video session

Defect Pareto Analysis Sessions

Monthly facilitated review of defect categories with ranked Pareto charts tied to your corrective action log.

₩850,000 per session

All reporting packages

On-site first, then recurring delivery

  1. Walk the line. We map where defects are recorded, which spreadsheets shift leads already use, and what your auditors expect to see in handover documentation.
  2. Draft and review. Report layouts are reviewed with your quality lead before any data is populated — no surprise formats on a Friday night shift.
  3. Pilot, then roll out. One line, two shift cycles, adjustments, then full plant deployment with supervisor training included.

What plant teams say after the first month

Our morning meeting used to reopen the same solder defect debate because nobody trusted the previous shift's spreadsheet version. Aldercore's numbered handover IDs fixed that within two weeks — though I wish they'd flagged our duplicate defect codes earlier during setup.

— Hyun-woo Chae, Quality Coordinator, precision motor assembly, Suwon

The executive briefing fits on one page my director reads on the plant floor. Scrap cost trend is visible without opening three different MES exports. Setup took longer than quoted because our data exports were messier than we admitted.

— Yuna Jeong, Plant Quality Manager, medical device subcontractor, Osan

Read more client stories

Recent writing from our analysts

Response within 2 business days

Tell us about your plant's reporting gaps

Send a brief describing your lines, shift schedule, and what your team currently produces at handover. We reply with scope options and a site visit date.

Request a brief